Everett, WA · Serving Snohomish County and nearby areas

Licensed, bonded & insured · WA #VISIOFL937R6

Mon–Fri 8:00 am – 8:00 pm · Sat 10:00 am – 5:00 pm

Newly installed light hardwood floor in an empty room with a step down to a lower level

New hardwood floors

Hardwood Floor Installation

New hardwood installed the right way for your home and subfloor: prefinished or finished on site, nailed, glued or floating. We test moisture, let the wood acclimate inside your home and give you a clear written estimate.

At a glance

Typical labor
$3–$6 per sq ft, depending on the method
Acclimation
3–5 days inside your home before installation
Methods
Nail-down, staple-down, glue-assist, glue-down or floating
Stairs
$100–$160 per step

What we install

Hardwood for your floor and your subfloor

The right installation method depends on the flooring product, the subfloor and the room. We recommend one before we price your project.

Flooring

  • Prefinished hardwood, finished at the factory and ready to use when it’s installed
  • Unfinished hardwood, sanded, optionally stained and finished on site with three coats
  • Solid and engineered products

Subfloors

  • Plywood
  • Concrete, with glue-down or floating installs (sealing or self-leveling when required)
  • Existing wood floors, evaluated project by project

Our process

How we install hardwood

  1. Step 1: Measure and plan

    We measure, check the subfloor and help you choose the product and the right installation method.

  2. Step 2: Delivery and acclimation

    The wood is delivered 3–5 days before installation to acclimate inside your home, never in the garage. Some products need longer; the manufacturer’s requirements come first.

  3. Step 3: Moisture testing

    We check the moisture in both the subfloor and the new wood. Our standard: within 5 percentage points of each other (for example, 8% and 13%), plus any stricter manufacturer rules.

  4. Step 4: Removal and preparation

    Old flooring comes out when it’s part of your estimate. Light sanding of plywood seams is included; major leveling or repairs are quoted separately.

  5. Step 5: Installation

    Your floor goes in with the method that fits the product and subfloor. Most small T-mold transitions are included.

  6. Step 6: Finish and walk through

    Unfinished floors are sanded, stained if you like and finished with three coats. Then we walk through the floor with you and hand over your Customer Project & Warranty Package.

Pricing

Typical hardwood installation prices

Approximate labor guidelines, not quotes. Hardwood and pad material are priced separately.

Typical hardwood installation prices
ServiceTypical labor
Hardwood installationDepends on the installation method $3–$6 per sq ft
Glue-down over concreteAdhesive included about $8 per sq ft
Sanding and finishing (unfinished floors)Three coats of finish standard $4–$6 per sq ft
Stain colorOptional $0.75–$1.50 per sq ft
Stairs, treads and risersDepends on size and complexity $100–$160 per step
Minimum project price $800

Installation methods

  • Nail-down or staple-down: standard hardwood over plywood
  • Glue-assist: boards 5 in. wide or wider, including most wide-plank engineered
  • Glue-down: over concrete or another hard surface where nails can’t be used
  • Floating: certain engineered and locking-system products over a pad

Priced separately at your estimate: removal of the old floor, subfloor leveling or repairs, concrete sealing when required, larger transitions, furniture moving and delivery when it applies.

Hardwood installation methods compared

Matching & stairs

Blending into existing floors

New hardwood can sometimes be woven into an existing wood floor when the same flooring is still available. With unfinished wood, the old and new boards are usually sanded and finished together so they look as consistent as possible.

Wood varies from one production run to the next and changes with age and wear, so a perfect match can’t be guaranteed. We’ll tell you honestly what to expect before you decide.

Hardwood stairs

We install hardwood stair treads and risers, priced per step: one tread plus one riser is one step, a nosing counts as one step, and a landing counts as two. We don’t install skirt boards, newel posts, railings or balusters; on larger flooring projects we can coordinate that work with contractors we trust. Read hardwood stairs: treads, risers and how they tie into your floors.

After installation

  • Prefinished hardwood: furniture and area rugs can generally go back right away.
  • Fully glue-down floors: allow 2–3 days before furniture and rugs, depending on the adhesive.
  • Site-finished floors: follow the refinishing waiting times for furniture and rugs.
  • Use felt pads on all furniture legs.
  • You can supply your own flooring or have us supply it. Either way, it acclimates inside your home first.

Your work is covered by our Limited One-Year Workmanship Warranty. Products carry their own manufacturer warranties.

Reviews

What customers say about our hardwood floor installation

Best hardwood floor install I've ever seen. Smooth as glass. There were no sanding marks near the walls. Hardwood tight as can be. Originally installed in 2006 (now 2012), and in top condition. In the meantime, the other contractor I used for another floor install in 2005 has to be refinished. Of course I'm having it refinished by Alex's crew at Vision. On time, reasonable prices, great craftsmanship. It doesn't get better.

Mark M.

We are extraordinarily pleased with the work done for us by Alex Babko and his Vision Flooring team. Our goal was new hardwood installation in Living-, Dining-, Family-Rooms, Office & Stairwell treads, together with a refinish and blending in with existing kitchen & hall wood floors..."and, by the way, could you just do something to make the stairs not squeak so much." Once the old carpets were removed, this…

Read the full review

We are extraordinarily pleased with the work done for us by Alex Babko and his Vision Flooring team. Our goal was new hardwood installation in Living-, Dining-, Family-Rooms, Office & Stairwell treads, together with a refinish and blending in with existing kitchen & hall wood floors..."and, by the way, could you just do something to make the stairs not squeak so much." Once the old carpets were removed, this substantial job presented the guys with problems involving sub-floor level disparities and a dangerously unsupported stairwell under-structure. Alex was extremely conscientious and fair in his proposed additional charges for dealing with those problems, and the final result of all their work in our home is simply wonderful. They worked patiently with us to get the stain color exactly right; the significant amount of new-to-old floor blending is flawless; and we walk--'glide'-- now up and down our squeak-less superbly supported stairs! Alex and his team and are skilled craftsmen, well worth their price as well as any potential wait in line for their services.

Lynda

Read more reviews

FAQ

Hardwood installation questions

How long does hardwood need to acclimate?

Hardwood is generally delivered 3–5 days before installation so it can acclimate inside your home, not in the garage. Some products need longer; the manufacturer’s requirements come first.

Do you test for moisture before installing hardwood?

Yes. We check the moisture in both the subfloor and the new hardwood. Our standard is that they should be within 5 percentage points of each other, along with any stricter manufacturer requirements.

Which installation method will my floor need?

It depends on the product and the subfloor: nail-down or staple-down for standard hardwood over plywood, glue-assist for wide planks, glue-down over concrete, or floating for certain engineered products. See hardwood installation methods compared.

Can new hardwood be blended into my existing floor?

Often, yes. New boards can be woven in and sanded and finished together with the existing floor. Wood varies by production run, age and wear, so a perfect match can’t be guaranteed.

Do you install hardwood on stairs?

Yes, hardwood treads and risers, priced per step. We don’t install railings, newel posts, balusters or skirt boards ourselves; on larger flooring projects we can coordinate that work with trusted contractors.

Can hardwood run parallel to the floor joists?

Yes, if the subfloor is stiff enough. Perpendicular is the preferred direction. Read can hardwood run parallel to the floor joists?

How do I care for my new prefinished hardwood floor?

Furniture and area rugs can go back right away; put felt pads under every furniture foot. Vacuum or dust-mop weekly and clean with Bona Floor Cleaner (not the polish). Prefinished hardwood usually can’t be recoated, and most engineered hardwood can’t be refinished, so everyday care matters most. Printable care sheet (PDF).

See all flooring questions

Guides

Plan your new hardwood floor

More services

Other ways we can help

Refinished hardwood floor in a living room with a fireplace

Hardwood Floor Refinishing

Restore the beauty of your existing hardwood floors with professional sanding, staining and finishing.

Wood-look plank floor in a living room with a white sofa

LVP / LVT Installation

A realistic wood or stone look that handles everyday spills, pets and busy households.

Wood-look plank floor in a dining area

Laminate Installation

An affordable wood look with a hard-wearing surface. A smart pick for dry living areas and bedrooms.

Wide white baseboard and column base on a wood floor

Baseboard Installation

New baseboards, door and window casing, quarter round and shoe molding, with your new floors or on their own.

Bright living room with a light hardwood floor, a sofa and a kitchen in the background

Free in-home estimates

Let’s talk about your floors

Tell us a little about your project and we’ll set up a free in-home estimate. We usually reply the same business day.

Our Reviews

Not ready yet? Get a rough price with our free flooring calculator.